Sendsei AI game review

Access the Inaccessible · Live CV Review

Real video · Gabo CV cv-0.2.0 · evidence-grounded analysis

Evidence quality medium
Analyzed timeline9.5stop-out bounded
Move phases55 explained by AI
Measurements20100% cited by AI
Contact states134 route holds
CV signals58 evidence frames
Your attempt
0:000:09
Analyzed window0:00–0:098.0s descent excluded

AI analysis engine

Analysis

Grounded in all 20 measurements across 5 phases. Symbols classify evidence—not difficulty or send probability.

Review · P1

Establish

Establish phase. Left hand confirmed on LONG-H1 (confidence 0.88). Right hand visibility low (0.076) but contacts from later phases show it reaches LONG-H3. Both feet low visibility. Hip pause 1300 ms with drift 0.054.

Active contacts

Left Hand · LONG-H1 · 88%

CV flags

No unusual signal

Phase duration1333 msAI cited
Longest hip pause1300 msAI cited
Projected hip displacement0.054AI cited
Hip path/displacement ratio1.32AI cited
Evidence noteright hand visibility below 0.5 for 41 frames

Confirmed color-locked route

8 holds drive this analysis.

Observed contact sequence: LONG-H1 → LONG-H3 → LONG-H2 → LONG-H5. No optimal beta is claimed without a confirmed reference attempt.

These are image-plane estimates, not an optimal beta. Wall angle, depth, grip quality, force, and fatigue are not modeled.

Current phase · Complete measurements

P1 exposes every CV metric.

Durations, pauses, drift, sway, and regrabs come from the deterministic pipeline. They are image-plane proxies—not force or definitive cause.

Phase duration1333 ms

Wall-clock time between the contact-state changes bounding this phase.

Longest hip pause1300 ms

Longest interval with projected hip speed below threshold; 2D image-plane measure.

Projected hip displacement0.054

Net 2D displacement of the hip midpoint over the phase; not a 3D or center-of-mass measurement.

Hip path/displacement ratio1.32

Total 2D hip path length divided by net displacement over the phase; 2D image-plane measure, only emitted when net displacement >= 0.01.

Priority momentP2

The climber established left hand on LONG-H1 (start), then reached right hand to LONG-H3, followed by left hand to LONG-H3 (via candidate LONG-H2), and finally right hand to finish hold LONG-H5 with a regrab. The attempt ended at the finish hold. The divergence occurred in P2, where the left hand reached to LONG-H1 but the climber exhibited a long dwell (3334 ms) and high hip sway (ratio 3.12) while both feet had low visibility, suggesting difficulty stabilizing after the first move.

Observed

In phase P2 (1333-4667 ms), left hand holds LONG-H1, right hand reaches LONG-H3, but the phase duration (3334 ms) is over 2x median with a hip pause of 2166 ms, and the hip path/displacement ratio (3.12) exceeds threshold 3.0, while left and right foot visibility are below 0.5 for extended periods.

Inferred

The climber likely struggled to stabilize after the initial left-hand hold, possibly due to poor foot placement or body tension, leading to prolonged adjustment and sway. However, low foot visibility limits confidence.

Other plausible explanations
  • Climber may have been reading the next hold or resting rather than struggling.
  • Low foot visibility could indicate occluded markers, not necessarily poor foot contact.

Known limitations

What this review cannot tell you.

  • All measurements are 2D image-plane observations from one fixed camera; depth, force, and definitive causality are not observable.
  • Standalone local analysis labels the required primary contract attempt as failed; the recording outcome was not independently verified.
  • The route polygons were approximated from the supplied recording for this local run and require climber confirmation before production use.
  • failed attempt: Analysis truncated at top-out (t=9500 ms): right hand held finish hold LONG-H5 for 1000 ms; the descent is not analyzed.
  • Foot visibility was low in critical phases (P1, P2, P3), limiting assessment of foot placement and stability.
  • Left hand on LONG-H2 during P4 had only 11 overlapping frames (<15), making that contact a candidate rather than confirmed.